In 50 words: Under NEM 3.0, PG&E and SDG&E's 2026 export credits average 3 to 5 cents per kWh across a south-facing system's exports, against 28 to 69 cents for power you import. Spring middays pay under 1 cent; August evenings pay over $1. Most of solar's value now comes from self-use and batteries.
California's Net Billing Tariff, known as NEM 3.0 and sold by the utilities as the Solar Billing Plan, pays for exported solar at a different rate for every hour. Most articles quote one figure, usually "about 4 to 8 cents". That hides both the near-zero spring middays and the evening hours worth more than retail power.
We took the 2026 export price files that PG&E and SDG&E publish for customers who file an interconnection application in 2026, and ran them against hourly solar output for seven California cities and NREL's hourly load profile for a California single-family home. You can run your own numbers in the NEM 3.0 calculator.
How NEM 3.0 export credits work
- Every hour has its own price. Exports are "multiplied by the hourly avoided costs values calculated by the Avoided Cost Calculator", in the words of PG&E's NBT tariff. Each utility publishes a value for every month, weekday or weekend, and hour: 576 slots a year.
- Your vintage is locked for nine years. You get the price schedule for the year you file your interconnection application, guaranteed for nine years from permission to operate, according to SDG&E's export pricing readme.
- Imports and exports are not netted. PG&E's tariff says customers "will be billed based on no netting of imports (consumption) and exports". Power you import at 7 pm is charged at the 7 pm import rate, whatever you exported at noon.
- A small bonus for early adopters. PG&E's ACC Plus adder is $0.0088 per exported kWh for 2026 applications ($0.036 for low-income customers), fixed for nine years. It falls to $0.0044 for 2027 applications.
- Imports are on a time-of-use rate. PG&E's E-ELEC schedule says residential NBT customers "must be served under this schedule". For SDG&E we use its standard time-of-use plan, TOU-DR1.
Export rates by month and hour
Weekday export credit in cents per kWh, 2026 values for the 2026 vintage, generation plus delivery components. PG&E's ACC Plus is not included.
| Month | PG&E noon | PG&E 6 pm | PG&E 7 pm | SDG&E noon | SDG&E 6 pm | SDG&E 7 pm |
|---|---|---|---|---|---|---|
| January | 6.7 | 10.2 | 9.4 | 6.3 | 10.0 | 9.0 |
| February | 4.7 | 9.5 | 8.9 | 4.4 | 9.2 | 8.6 |
| March | 1.9 | 8.7 | 8.5 | 1.6 | 8.1 | 8.0 |
| April | 0.9 | 7.8 | 7.8 | 0.4 | 7.3 | 7.3 |
| May | 1.3 | 8.2 | 8.7 | 0.9 | 8.0 | 8.5 |
| June | 3.3 | 27.1 | 27.0 | 2.8 | 8.7 | 9.0 |
| July | 5.8 | 36.4 | 45.7 | 5.2 | 32.4 | 33.2 |
| August | 6.8 | 113.0 | 115.4 | 6.1 | 107.0 | 90.8 |
| September | 6.2 | 46.1 | 59.5 | 5.5 | 45.0 | 58.2 |
| October | 5.8 | 9.4 | 9.3 | 5.4 | 19.2 | 9.1 |
| November | 5.6 | 9.0 | 8.7 | 5.4 | 8.7 | 8.5 |
| December | 6.3 | 9.8 | 9.1 | 5.7 | 9.6 | 8.9 |
Three things stand out:
- Spring middays are worth almost nothing. Between 10 am and 2 pm, PG&E's credits average 4.0 cents across the year and SDG&E's 3.6 cents, and April noon is under 1 cent with both utilities. That is when a south-facing array produces most.
- August evenings are worth more than retail. A weekday PG&E export at 7 pm in August earns $1.15 per kWh, about twice the summer peak import rate of 55 cents. The highest single slot in either file is PG&E's August weekend 7 pm at $1.19.
- The two utilities are close. SDG&E's values are within 1 cent of PG&E's in 543 of the 576 slots. The main difference is June, where PG&E's evening values are about three times SDG&E's.
What a typical system actually earns per exported kWh
A 5 kW south-facing system on a 20 degree roof, in a home using 9,338 kWh a year (the average California single-family home in NREL's ResStock model), on 2026 rates. "NEM 2.0-style" credits each export at the import rate of the same hour, to show what the change costs.
| City | Utility | Exported share | Credit per exported kWh | Year-one savings | NEM 2.0-style savings |
|---|---|---|---|---|---|
| San Francisco | PG&E | 44% | 4.3 cents | $1,644 | $2,543 |
| San Jose | PG&E | 46% | 4.5 cents | $1,677 | $2,675 |
| Sacramento | PG&E | 46% | 4.5 cents | $1,663 | $2,639 |
| Fresno | PG&E | 47% | 4.4 cents | $1,652 | $2,653 |
| Bakersfield | PG&E | 48% | 4.5 cents | $1,658 | $2,715 |
| San Diego | SDG&E | 46% | 3.3 cents | $2,217 | $3,721 |
| Escondido | SDG&E | 48% | 3.3 cents | $2,267 | $3,940 |
PG&E figures include the 0.88 cent ACC Plus bonus. We have not yet confirmed SDG&E's ACC Plus value from a primary source, so it is left out; with it, SDG&E's credit per kWh would be a little higher.
Roughly half of a 5 kW system's output is exported, and each exported kWh earns 3 to 5 cents. Each kWh used at home instead avoids the import rate, which is 28 to 55 cents with PG&E and 37 to 69 cents with SDG&E. Under NEM 3.0, a self-used kWh is therefore worth about ten times an exported one. That is why the same system saves about $900 to $1,700 a year less than it would if exports earned retail rates.
What a battery adds
A battery moves midday surplus into the evening, where it covers imports at 32 to 69 cents or, in late summer, exports at up to $1.15. With one 13.5 kWh battery (Tesla Powerwall 3 datasheet: 5 kW charge, 11.5 kW discharge, 89% solar-to-battery-to-home efficiency) added to the same 5 kW system:
| City | Utility | Extra savings per year | Solar shifted through the battery |
|---|---|---|---|
| San Francisco | PG&E | $1,077 | 2,940 kWh |
| San Jose | PG&E | $1,287 | 3,300 kWh |
| Sacramento | PG&E | $1,255 | 3,199 kWh |
| Fresno | PG&E | $1,263 | 3,244 kWh |
| Bakersfield | PG&E | $1,331 | 3,439 kWh |
| San Diego | SDG&E | $1,909 | 3,258 kWh |
| Escondido | SDG&E | $2,045 | 3,589 kWh |
Berkeley Lab's 2025 data update found that paired home solar and storage systems cost a median $1.7 per watt of solar more than solar alone (2024 cash installs). For a 5 kW system that is about $8,500, which would pay back in about 6.6 years in San Jose and 4.5 years in San Diego on these figures. Your quote may be higher. Powerwall 3 carries a 10-year warranty, so the payback needs to land well inside that. No federal tax credit applies to batteries or solar owned by a homeowner and installed after 2025.
These battery figures are an upper estimate. The model works on an average day for each month and assumes the battery cycles every day. Cloudy days, and a home that uses more at midday, both reduce the surplus available to store.
South or west under NEM 3.0?
West-facing panels produce more in the late afternoon, when power is used at home and exports are worth more. We ran the same 5 kW system facing west at 20 degrees (PVWatts v8):
| City | West output vs south | Solar-only savings, south / west | With a 13.5 kWh battery, south / west |
|---|---|---|---|
| San Francisco | -12% | $1,644 / $1,658 | $2,721 / $2,449 |
| San Jose | -12% | $1,677 / $1,704 | $2,964 / $2,638 |
| Sacramento | -14% | $1,663 / $1,675 | $2,918 / $2,556 |
| Fresno | -13% | $1,652 / $1,664 | $2,915 / $2,565 |
| Bakersfield | -13% | $1,658 / $1,669 | $2,989 / $2,644 |
| San Diego | -10% | $2,217 / $2,252 | $4,127 / $3,735 |
| Escondido | -11% | $2,267 / $2,293 | $4,312 / $3,856 |
Without a battery, a west roof makes 10-14% less energy but saves $11-35 a year more, because more of its output is used at home. With a battery the picture flips: the battery already moves midday solar into the evening, so the south roof's extra energy wins by $272-456 a year. In short, a west roof is no handicap under NEM 3.0, but if you are adding a battery, south is still the better face. East-facing panels do worst: they make 13-16% less than south-facing ones and, without a battery, save $245-340 a year less, because their morning output overlaps less with when the home uses power.
What to do with these numbers
- Size for your own use, not for export. Each extra kW that only adds exports earns about 4 cents per kWh. If the calculator shows your export credits exceeding your import charges, the surplus at your annual true-up is paid at the lower Net Surplus Compensation rate.
- Consider a battery before extra panels. At these rates a battery shifts more value per dollar than a larger array, provided your quote is near Berkeley Lab's median.
- Check your vintage. The 2026 values here apply if you file your interconnection application in 2026. PG&E's ACC Plus halves to $0.0044 for 2027 applications, and SDG&E has published preliminary 2027 export prices.
- Use your real usage. The load shape here is an average home. An EV charged overnight or a heat pump changes how much solar you use directly. Enter your own annual use in the NEM 3.0 calculator.
Method and limits
Export credits are PG&E's "Solar Billing Plan EEC Values Price Sheet 2026" (Energy Produced plus Energy Delivered) and SDG&E's NBT26 export pricing file (generation plus delivery), both for calendar-year 2026. Import rates are PG&E E-ELEC total bundled rates effective June 1, 2026 (summer June to September) and SDG&E TOU-DR1 rates effective August 1, 2026 (summer June to October), priced above 130% of baseline. Below that level, SDG&E rates are 10.7 cents lower.
Solar output is PVWatts v8 hourly output (NSRDB typical-year weather, 14% losses), and household use is NREL ResStock's California single-family detached profile, both averaged to a typical weekday and weekend day per month. Hourly averages net more solar against use than the meter does, so real self-use is somewhat lower than modelled. The fixed base services charge, $0.79343 a day for most customers on both utilities, does not change with solar and is left out. SCE is not covered because its export price file sits behind a Microsoft login. Customers of community choice aggregators get generation credits from their CCA, which may differ from these.
Frequently asked questions
What is the NEM 3.0 export rate in 2026?
It changes every hour. For a south-facing home system the average across all its exports is about 4.3 to 4.5 cents per kWh with PG&E (including the ACC Plus bonus) and about 3.3 cents with SDG&E, using the 2026 price files. Individual hours range from under 1 cent on spring middays to over $1 on August evenings.
Is the NEM 3.0 export rate the same every year?
No. Each application year (vintage) has its own schedule of hourly values, and that schedule is guaranteed for nine years from permission to operate. The values for later calendar years within those nine years come from the same vintage's forecast, so they also change year to year.
Why are NEM 3.0 export credits so high in August evenings?
The credits follow the utilities' avoided costs, which peak when the grid is shortest of power: hot evenings after solar output falls. PG&E's 2026 sheet values a weekday 7 pm export in August at $1.15 per kWh. Rooftop solar produces little at that hour, so mainly batteries capture it.
Does NEM 3.0 apply to me?
PG&E says solar customers who submitted their interconnection application after April 14, 2023 are on the Solar Billing Plan. Customers on NEM 1.0 or 2.0 stay there until their 20-year legacy period ends and then move over at their annual true-up.
Related
Sources
- PG&E, Solar Billing Plan Energy Export Credit price sheets 2023-2026 (ZIP)
- SDG&E, Solar Billing Plan Export Pricing (LY2026 NBT pricing file)
- PG&E Electric Schedule NBT (Net Billing Tariff), incl. ACC Plus
- PG&E Electric Schedule E-ELEC, effective June 1, 2026
- SDG&E Schedule TOU-DR1 Total Rates Table, effective August 1, 2026
- PVWatts v8 (National Laboratory of the Rockies)
- NREL ResStock 2024 release 2, end-use load profiles
Researched and drafted by the Earth Energy Log Editorial Desk with AI assistance. Reviewed by Pruthvi A. before publication.
How we work: Editorial standards · AI disclosure · Report an error