Skip to content
Battery Storage · Finance & M&A · Explainer

Battery storage cost per MWh (LCOS) in 2026: why the numbers disagree

Ember puts the levelized cost of utility-scale battery storage at $65/MWh, but that excludes the electricity used to charge it. Add charging at $40/MWh and 90% efficiency and the battery needs about $107 per MWh sold. Capex, the discount rate and how often it cycles move the figure most.

Reviewed by Pruthvi A. · 5 min read
Rows of battery storage containers beside a large solar farm in the desert
Photo: BLM California (public domain)

In 50 words: Ember puts the levelized cost of utility-scale battery storage at $65/MWh, but that excludes the electricity used to charge it. Add charging at $40/MWh and 90% efficiency and the battery needs about $107 per MWh sold. Capex, the discount rate and how often it cycles move the figure most.

Two credible sources can publish battery storage costs that differ by half and both be right. Most of the gap is not about batteries. It comes from what each figure counts, and from three inputs that sit outside the battery: the cost of capital, how hard the battery is used, and the price of the electricity it buys.

This explainer separates those pieces. Every figure below comes from the LCOS calculator, which uses Ember's published assumptions as its defaults, so you can reproduce each number and change any input.

Two definitions of LCOS

The levelized cost of storage is the lifetime cost of a project divided by the energy it delivers, with both discounted to today. The disagreement is over what counts as a cost.

DefinitionWhat it measuresIncludes charging electricity?Used by
Storage onlyThe cost of shifting one MWh from one time to anotherNoEmber
Including chargingThe cost of discharging one MWhYesLazard

Ember states the difference directly: its figure "reflects the cost of shifting one MWh to another time" and leaves out charging, while Lazard's reflects "the cost of discharging one MWh" and includes it. Neither is wrong. The storage-only figure compares batteries with each other; the figure including charging compares a battery with a generator or a sale price.

Ember's $65/MWh, input by input

Ember's December 2025 analysis covers large utility-scale batteries in markets outside China and the US. Its assumptions:

InputEmber's value
All-in capex$125/kWh (October 2025): about $75 for equipment, $50 for EPC and grid connection
Life20 years
Round-trip efficiency90% (AC to AC)
Use80% of one full cycle a day
Degradation2% a year, leaving about 65% of usable energy after 20 years
Operating cost2% of capex a year, about $2.5/kWh
Discount rate7%
LCOS, storage only$65/MWh

With the same inputs, our calculator gives $62.7/MWh. Ember does not publish its exact formula, so a gap of about 4% is expected. Our method is written out on the calculator page: each day the battery cycles its usable capacity times the cycle depth and returns that energy times the round-trip efficiency.

Add charging and the number almost doubles

A battery that sells energy must first buy it, and it loses some on the way. At 90% round-trip efficiency, every MWh sold needs 1.11 MWh bought.

At a charging price of $40/MWh, that adds about $44/MWh. The cost including charging is $107/MWh, which is also the average price the battery must sell at to break even before any other revenue. The break-even spread between buying and selling is about $67/MWh.

This is the comparison most project decisions turn on, and it is why a $65/MWh headline does not mean a battery can profitably sell power at $70.

What moves LCOS most

All rows use Ember's inputs with one change. "Capacity payment" is the flat monthly payment per kW of power that recovers capex and operating cost over the project's life, the figure capacity contracts and tenders are priced in.

Change from Ember's inputsLCOS, storage only ($/MWh)Including $40/MWh charging ($/MWh)Capacity payment, 4-hour ($/kW-month)
None (Ember defaults)62.7107.14.77
Capex $100/kWh50.294.63.81
Capex $160/kWh80.2124.76.10
Discount rate 10%74.2118.65.73
Life 15 years69.1113.55.41
Half as much use (40% of a cycle a day)125.4169.84.77
Twice as much use (two 80% cycles a day)31.375.84.77
Degradation 3% a year67.1111.54.77
Round-trip efficiency 85%66.4113.44.77

Three patterns stand out:

  • Use matters as much as capex. Halving how often the battery cycles doubles the storage-only LCOS, because the same capital is spread over half the energy. The twice-as-much-use row holds degradation at 2% a year; in practice heavier cycling wears the cells faster, so read it as a best case.
  • The cost of capital is a big lever. Moving from 7% to 10% adds about a fifth to every figure. Ember calls its 7% a conservative upper limit for projects with guaranteed revenue; use your own cost of capital.
  • Capacity payments don't depend on use. The payment per kW-month only recovers fixed costs, so cycling more or less does not change it. It does scale with duration: a 2-hour battery at the same cost per kWh needs half the payment of a 4-hour one, $2.38 against $4.77 per kW-month.

How to compare two LCOS figures

  1. Check the definition. If one figure includes charging and the other does not, the gap can be $40/MWh or more before anything else differs.
  2. Check the use assumption. A figure based on one full cycle a day and one based on 300 cycles a year are not the same battery economics.
  3. Check the discount rate and life. A 7% rate over 20 years and a 10% rate over 15 years can separate two otherwise identical projects by $15/MWh or more.
  4. Check the capex boundary. Ember's $125/kWh includes EPC and grid connection but assumes the land is provided or cheap. Some figures quote equipment only.

Run your own inputs in the LCOS calculator. For India's capacity tenders, which are priced in rupees per MW per month, use the BESS tariff calculator.

Free toolSize a home battery and see cost and paybackOpen BESS calculator →

Sources

  1. Ember, How cheap is battery storage? (December 2025)
  2. Ember, LCOS calculator methodology
  3. PNNL, Levelized cost of storage methodology
  4. Lazard, Levelized Cost of Energy+ (2026 edition)
EE
About the authorEarth Energy Log Editorial DeskArticles are researched and drafted by the Earth Energy Log desk with AI assistance, checked against primary sources, and reviewed by a named editor before publication.More from Earth Energy Log Editorial Desk →

Researched and drafted by the Earth Energy Log Editorial Desk with AI assistance. Reviewed by Pruthvi A. before publication.

How we work: Editorial standards · AI disclosure · Report an error

More in Battery Storage

Newsletter

The weekly brief

Every Tuesday: the 5 stories that matter, India tender awards roundup, one chart we made. Free.

No spam. Unsubscribe in one click.