The subsidy is fixed by capacity, not by price: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, with higher rates in special category states and nothing beyond 3 kW. Most buyers also take the bank loan, so the real question is whether the monthly bill saving covers the EMI. This works out both.

Who is applying

Special category States/UTs get a higher subsidy.

From your bill: units = kWh.

MNRE's benchmark is ₹50,000/kW for the first 2 kW; use your vendor's quote.

Some states add their own subsidy. Check your state nodal agency or DISCOM.

PIB: a 3 kW system generates over 300 units a month on average. Lower in cloudy or shaded locations.

The energy charge per unit on your bill, at your usual slab.

Set by your state's net metering or net billing rules; 0 if surplus earns nothing.

Bank loan

SBI: 6.00% up to ₹2 lakh, 8.15% from ₹2-6 lakh (October 2026). Filled in from the loan amount.

Your PM Surya Ghar estimate

Suggested size for your use
2-3 kW
Size that covers your use
3 kW
Central subsidy (CFA)
₹78,000
Installed cost
₹1,50,000
Your cost after subsidy
₹72,000
Generation per month
300 units
Bill saving per month
₹2,100/month
Payback on your cost
2.9 years
Loan amount (90% of cost)
₹1,35,000
EMI (6%, 10 years)
₹1,499/month
EMI if the subsidy prepays the loan
₹633/month
Your bill saving covers the EMI
₹601/month

Estimates only. The subsidy is paid after commissioning by direct benefit transfer; EMI ignores the 6-month moratorium. Your vendor's quote, roof and DISCOM rules decide the real result.

Defaults and sources

Central subsidy (CFA)
₹30,000/kW for the first 2 kW and ₹18,000/kW for the 3rd kW, none beyond 3 kW (special category States/UTs: ₹33,000 and ₹19,800); housing societies/RWAs ₹18,000/kW (₹19,800) for common facilities up to 500 kW at 3 kW per houseMNRE, Operational Guidelines for PM-Surya Ghar: Muft Bijli Yojana, CFA to Residential Consumers · checked Nov 10, 2026
Special category States/UTs
Uttarakhand, Himachal Pradesh, J&K, Ladakh, the North-Eastern States including Sikkim, Andaman & Nicobar and LakshadweepMNRE, Operational Guidelines for PM-Surya Ghar: Muft Bijli Yojana · checked Nov 10, 2026
Benchmark installed cost
₹50,000/kW for the first 2 kW and ₹45,000 for the additional kW (special category: ₹55,000 and ₹49,500), from February 13, 2024; actual quotes varyMNRE, Operational Guidelines for PM-Surya Ghar: Muft Bijli Yojana · checked Nov 10, 2026
Size guide and generation
0-150 units a month: 1-2 kW; 150-300 units: 2-3 kW; over 300 units: above 3 kW. A 3 kW system can generate over 300 units a month on averagePIB, PM Surya Ghar: Muft Bijli Yojana (March 2025) · checked Nov 10, 2026
PM Surya Ghar bank loan (SBI)
6.00% for loans up to ₹2 lakh and 8.15% for ₹2-6 lakh (effective October 15, 2026, floating); minimum margin 10% of project cost; up to 120 months including a 6-month moratoriumState Bank of India, PM Surya Ghar: Loan for Solar Roof Top · checked Nov 10, 2026

How the calculator works

The central subsidy follows MNRE's slabs: ₹30,000 per kW for the first 2 kW and ₹18,000 per kW for the next 1 kW (₹33,000 and ₹19,800 in special category States/UTs), counted for part-kW too. Capacity beyond 3 kW gets no central subsidy. Housing societies get ₹18,000 per kW (₹19,800) for common facilities, on the lower of the plant size, 3 kW per house and 500 kW.

Generation is size times units per kW per month. Units up to your monthly use save your per-unit rate; surplus units earn your export rate. Payback divides your cost after subsidies by the yearly saving.

The loan covers 90% of the installed cost (the bank's minimum 10% margin) up to ₹6 lakh. EMI is the standard reducing-balance formula; the second EMI assumes the subsidy, when it arrives, is used to prepay the loan.

PM Surya Ghar subsidy: common questions

How much subsidy do I get under PM Surya Ghar?

₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW: ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. Part-kW counts, so 2.5 kW gets ₹69,000. Nothing extra is paid beyond 3 kW.

Is the subsidy higher in some states?

Yes. In special category States and UTs (Uttarakhand, Himachal Pradesh, J&K, Ladakh, the North-Eastern States including Sikkim, Andaman & Nicobar and Lakshadweep) the rates are ₹33,000 per kW for the first 2 kW and ₹19,800 for the third, up to ₹85,800 for 3 kW.

Can a housing society or RWA get the subsidy?

Yes, for common facilities including EV charging: ₹18,000 per kW (₹19,800 in special category areas) on up to 3 kW per house and 500 kW in total. MNRE's example: a 100 kW plant in a society of 20 houses gets support on 60 kW, ₹10.8 lakh.

Will the loan EMI be more than my bill saving?

Usually not for a 3 kW system. At ₹50,000 per kW, the loan is ₹1.35 lakh after the 10% margin; at SBI's 6.00% over 10 years the EMI is about ₹1,500, against a saving of about ₹2,100 a month for 300 units at ₹7. If the ₹78,000 subsidy prepays the loan, the EMI falls to about ₹630.

What size system should I install?

PIB's guide: up to 150 units a month, 1-2 kW; 150-300 units, 2-3 kW; above 300 units, more than 3 kW. A 3 kW system generates over 300 units a month on average, so size roughly 1 kW for every 100 units you use.